Adrian-Madison-Beecher Drain

 

Large PDF
(  Kb) Basic
(  Kb) Aerial


 

DWF [?]
Basic (  Kb)
Aerial (  Kb)

STATUS OF ADRIAN MADISON BEECHER DRAIN PETITION PROJECT

 

-       July 11, 2008 Robert Oller, 2373 Linden Court  Adrian, MI 49221, was mailed petition for the Adrian Madison Beecher Drain.

-       July 22, 2008 petition returned by Robert Oller.

-       August 14&18, 2008 petition signatures checked, petition found valid.

-       August 26, 2008 County Treasurer’s Certificate certifies ‘no unpaid taxes.’

-       October 22, 2008 a Board of Determination determined the Petition to be necessary.

-       November 3, 2008 Lenawee County Clerks Office contacted and no appeals filed on Determination of the Necessity of the Petition.

-   June 2009  Survey completed.  Phase 1: New covers on catch basins.  Phase 2: Replace tile through woods.  Phase 3: is in Engineering & Design process.

-    February 2010   Berm installed and tile outlet replaced through woods.  Additional berm is being designed.

-    December 2010, Easement documents mailed for new backlot drain tile.

 

 

 

 

 
Stephen R. May
Lenawee County Drain Commissioner

 

 

Downloads

Drain Information

Petition Signers

Notice of Board of Determination